Background
We were tasked to coordinate a reservoir pumping station at Hallgate and producing the fabrication spool drawings. This involved modelling some of the largest pipework we have ever worked with.
Approach
This was not our usual type of coordination as the pipes and the pumping kit involved were much larger. All the concepts we work wit remain the same however and the discussions with the pump manufacturer to ascertain the maintenance and access parameters. We also worked with the design team to establish the technical specifications of the pipework we would be using as the pipe diameters were outside the scope of all of our existing pipework and flange detailing information.
Result
The final outcome was a maintainable pumping station where the spools were delivered and successfully assembled on site. You can see from the size of the pies involved, there was no room for error in our fabrication drawings as each spool involved seriously large items.
Achieve complete building coordination across all specialist systems in your industrial infrastructure project
Midland Press Facility
Background The Midland Press facility was a large project for Trinity Mirror in Birmingham. There were...